School officials in Meeker are still trying to figure out how to put an empty $18.9 million dollar elementary school up and running. Settling soil is being blamed for structural issues and a Denver-based geotechnical engineering firm says the problems can be fixed. The Denver Post says a study is needed on the soil classification and the school board hopes to sign off on it at its next meeting in December.